Project Summary

The Pirrie Park development replaced two gravel hockey pitches for Methodist College Belfast with 2G sand-dressed synthetic pitches designed and certified to FIH National standards. The facility includes spectator and boundary infrastructure, retractable LED floodlight columns, retractable ball-stop fencing, pitch drainage, electronic scoreboards, pitch furniture and ancillary storage.

Expertise & Delivery

The project was delivered through a coordinated programme of investigation, design, procurement and construction, with Doran Consulting establishing the critical path and milestones and managing the cost plan, value engineering, risk and design coordination. The team directed environmental assessment, site investigation and topographical surveys, secured planning and approvals and developed the earthworks, drainage, technical specifications, lighting, fencing, scoreboards and pitch furniture. Procurement and contractor selection were managed using MEAT criteria. During RIBA Stage 5, Doran Consulting administered the works, monitored programme and quality, coordinated site supervision and managed handover, final account and the defects period.