NIFRS Learning & Development Centre, Desertcreat

The Client: Northern Ireland Fire & Rescue Service (NIFRS)

Our roles: Civil Engineering, Structural Engineering, Traffic Engineering, Site Supervision

Project Summary

The Northern Ireland Fire & Rescue Service (NIFRS) Learning & Development Centre at Desertcreat, County Tyrone, is a purpose-built training campus designed to provide realistic, high-quality training environments for emergency service personnel.

The development comprises a diverse range of specialist facilities, including a flood water rescue facility, a simulated village, a four-storey training warehouse, a tactical firefighting facility, agricultural training structures and an academic building.

Doran Consulting was appointed to provide Civil, Structural and Traffic Engineering services, alongside Site Supervision, supporting the delivery of this complex training facility.

Expertise & Delivery

The project involved the design and coordination of several highly specialised training environments, each presenting distinct engineering challenges.

A key feature of the development is the flood water rescue facility, the first of its kind in Europe. This incorporates a 6,300m³ artificial reservoir and a 100-metre river channel, powered by three pumps to recreate realistic flood conditions. Advanced water treatment systems were also designed to neutralise water prior to discharge, exceeding Northern Ireland Environment Agency (NIEA) standards.

The simulated village includes residential and agricultural buildings, with movable floors designed to replicate the effects of gas explosions. A four-storey training warehouse provides realistic industrial, commercial and residential environments for live rescue exercises. The structural design of these facilities required careful consideration of dynamic loading, durability and long-term operational performance.

Doran Consulting worked closely with statutory authorities, including NI Water, DfI Roads, DfI Rivers, NIEA and NIE Networks, to coordinate regulatory approvals and infrastructure requirements. This included the development of drainage strategies, Sustainable Drainage Systems (SuDS), attenuation measures and water discharge solutions, alongside road infrastructure designed to accommodate emergency vehicles.

Technical design was delivered to RIBA Stage 4, supported by collaborative digital workflows and BIM Level 2 modelling in accordance with ISO 19650.