Bellanaleck Sewerage Scheme, Co. Fermanagh
This NI Water contract was for the construction of a new terminal pumping station on the site of the existing Bellanaleck WwTW and the installation of a 5.5km rising main to transfer effluent to the new wastewater treatment works at Enniskillen. This then facilitated the decommissioning of the failing activated sludge plant at Bellanaleck.
The new pumping station transfers flows for a population of 1,600 via a pumping main from the Bellanaleck area to Rossory pumping station at Enniskillen, taking the route along the Derrylin Road, including a river crossing at High Bridge, a river culvert near Lough Nablahy and a river crossing beneath the River Sillees. The Pumping Station includes septicity dosing plant with chemical spill tank.