Dogger Bank Wind Farm Substations
The Client: Hitachi Energy
Our roles: Lead Designer, Civil Engineering. Structural Engineering, Geotechnical Engineering
Project Summary
SSE Renewables, Equinor and Vårgrønn are investing £9 billion in a joint venture to develop the world’s largest offshore wind farm. Comprising three projects, Dogger Bank Wind Farm is expected to generate enough electricity to power 4.5 million UK homes.
Doran Consulting led the design team across all three Dogger Bank sites, providing engineering design services for the converter stations, ancillary buildings and associated infrastructure.
Expertise & Delivery
The converter station buildings comprise steel-framed structures with reinforced concrete fire wall enclosures around each transformer area. The structural steelwork was designed to accommodate varying equipment loads, deflection limits and complex earthing requirements.
The Valve Hall features a clear span of 24m and an approximate eaves height of 17m. Challenging ground conditions, including highly compressible clays, required detailed geotechnical analysis using PLAXIS 3D to mitigate long-term settlement.
Our scope also included the design of ancillary buildings, transformer bases and specialist equipment foundations within the AC switchyard, alongside concrete cable trenches and underground conduits. Careful design coordination was required to accommodate the extensive earthing infrastructure across the sites.